Prelude FLNG Float Out – Time Lapse Video | gCaptain
Check out this video from gCaptain of Shells Prelude FLNG (floating liquefied natural gas) plant. It was built in the shipyard in Geoje, South Korea and will be headed to work in the Prelude gas fields in Western Australia. Interesting vessel! 🙂
It took a little over a year to build and they’re not expecting it to be operational until 2017. So far, they’re saying it’ll cost around $12 BILLION to build it! Expecting it to work for 25 years, that’s still a LOT of money! Personally, if I had a billion dollars to spend, I would want something to last longer than only 25 years!
People are always griping about how expensive gas is. This kind of cost for the equipment they need to get the basic resource out of the ground is PART of the reason for that.
I thought it was a pretty cool video and the ship itself is another milestone as far as what we are doing offshore around the world. Check out the link and the video! 🙂
https://www.youtube.com/watch?feature=player_embedded&v=HOBiNQDPOqI#t=10